Skip Links
U.S. Department of State
Secretary Rice Meets With Pakistani Offi...  |  Daily Press Briefing | What's NewU.S. Department of State
U.S. Department of State
SEARCHU.S. Department of State
Subject IndexBookmark and Share
U.S. Department of State
HomeHot Topics, press releases, publications, info for journalists, and morepassports, visas, hotline, business support, trade, and morecountry names, regions, embassies, and morestudy abroad, Fulbright, students, teachers, history, and moreforeign service, civil servants, interns, exammission, contact us, the Secretary, org chart, biographies, and more
Video
 You are in: Under Secretary for Political Affairs > Bureau of Near Eastern Affairs > Releases From the Bureau of Near Eastern Affairs > Reports on Near Eastern Affairs > Section 2207 Report on Iraq Relief and Reconstruction > July 2006 - Section 2207 Report on Iraq Relief and Reconstruction > HTML Version 
Section 2207 Report on Iraq Relief and Reconstruction   -Back to July 2006 report.
Released by the Bureau of Near Eastern Affairs
July 2006

Appendix I

SECTOR: Security and Law Enforcement

The Ministry of Defense (MoD) and the Ministry of Interior (MoI) have assumed greater responsibility for security operations since the April 2207. Military and Police operations conducted by independent Iraqi forces are becoming an effective reality. More than 268,400 military and police personnel have now been trained and equipped, with an additional 52,000 due by September 30. As of June 26, 114 Iraqi Army, Special Operations and Strategic Infrastructure Battalions and 28 police battalions conduct counter-insurgency operations. Eighty-one Iraqi Army and Special Operations battalions are capable of operating "in the lead" or independently. Sixty nine Iraqi Army battalions and two police battalions control their own areas of responsibility. The MoD has accepted the lead in contracting basic logistical sustainment efforts (life support) for the various military installations throughout Iraq.

Significant advances have been made in the area of institutional training by both the MoI and MoD. The MoI 2006 Training Plan establishes a common training standard throughout the Iraqi Police Service (IPS) and places great emphasis on human rights, ethics and the rule of law. Based on current plans, the IPS’s nine police academies and the National Police and Department of Border Enforcement academies will transfer to Iraqi control by the end of the year. The development of professional ethics (the United Nations code of Conduct for Law Enforcement Officials) is included in the basic training syllabus for Iraq’s police forces. This is considered essential for a relationship between ethical behavior and effective police service. The Center for Professional Ethics and Leadership will be established by the end of 2006.

The MoD is also taking greater responsibility for training and developing its forces. Force Structure and policies are being developed and defined to meet the training needs of the Iraqi Armed Forces (IAF) out to 2011. The development of the Iraqi Training Doctrine Command (ITDC) development continues to move forward. The goal is to have the ITDC fully established by January 1, 2007. Many of the IAF’s training battalions, regional training centers and specialist schools are well established and operating with minimal Coalition training support. The Iraqi Center for Military Values and Principles and Leadership (ICMVPL) was established in February. The ICMVPL will ensure that the IAF conforms to the values and standards of basic human rights and the laws. To date it has designed a program of instruction (POI) which will ensure that the subject is included in all institutional, individual and collective training.

Ministry of Interior Forces Overview

The Ministry of Interior (MoI) has approximately 152,300 trained and equipped personnel. Its civil security force structure objective is 188,200 by the end of 2006. This force structure plan will generate Iraqi police forces capable in the current counterinsurgency (COIN) environment, as well as orient the MoI for the future. MoI forces consist of the Iraqi Police Service, including the former Iraqi Highway Patrol, National Police (formerly Special Police, comprised of the Police Commandos, the Public Order Police and the Mechanized Brigade), Emergency Response Unit, the Department of Border Enforcement and the Center for Dignitary Protection. The Civilian Police Assistance Training Team (CPATT) continues to train, equip and professionalize the Iraqi police forces. CPATT’s MoI Transition Team (MoI-TT) has 78 personnel. CPATT continues to concentrate on the development of MoI’s capability to support and direct its forces.

Iraqi Police Service: During the "Year of the Police," concerted efforts are being made to increase the training capacity of the Iraqi Police Forces. To date, over 107,000 police have been trained and equipped and more than 9,500 recruits completed a ten-week Basic Police Academy program during this quarter. Additionally, nearly 600 recruits graduated from the Transition Integration Program (TIP.). This three-week course is designed as a refresher and provides rule of law training to former regime police that have been rehired. To establish Iraqi ownership, increased emphasis has been placed on developing Iraqi Police instructors; the Iraqi Police instructor cadre reached 80% of the goal of 981. Over 680 Iraqi instructors are currently teaching in the basic police program. During late May, there were over 7,300 recruits in training. We continue to focus on leadership and professional development of the police force. The Baghdad Police College’s six-month Police Officers’ Academy graduated 285 new police lieutenants on March 30. 336 new Police lieutenants are enrolled in the nine month course, which started April 16. A three-year college is expected to commence in October with up to 1,000 new officer candidates. A "Sergeants to Officer" course started with 100 students which graduated March 30. The second course began in April. All academy recruiting responsibilities have transitioned to the MOI. The Iraqi Police Academies are on track to transition to MoI responsibility by year end.

Border Forces: During this quarter, the Department of Border Enforcement (DBE) continues to show progress towards Iraqi control of the borders. The DBE has over 21,500 trained and equipped personnel. These forces are organized into five regions, 12 brigades and 38 battalions. Progress in construction of border forts has significantly improved Iraqi coverage of the borders. We will continue to place emphasis on the development of Iraq’s operational capability to secure its own borders. The building of the DBE communication architecture is progressing and on track to be completed by August. Tactical integration is beginning to pay dividends by achieving layered security on the Syrian Border. The junior officer and non-commissioned officer’s "Train the Trainer" course was completed with 9 students graduating. These students will teach this course at the three regional training academies. The DBE has partnered with twenty-six eleven-person Coalition teams to facilitate the transition from Coalition to Iraqi control of the borders.

National Police: Approximately 22,000 National Police (formerly Special Police) have been trained and equipped, and continue to improve their abilities as a national, rapid-response force capable of countering armed insurgency, providing support to local civil security forces and operating as a "bridging" force between Iraqi Army and regular Provincial/Iraqi Police. The 1st and 2nd National Police (NP) Divisions (formerly the Command and Public Order Division) have standardized personnel and equipment authorizations and are working to standardize their Mission Essential Tasks (MET) to focus on civil support operations. The NP Divisions have reached their authorized number of 2,000 personneland they continue to train, equip and deploy police forces to fill existing units. The MoI plans to merge the 1st Mechanized Brigade into the 1st and 2nd NP Divisions. This merger will enhance the National Police’s mobility and survivability when manning checkpoints or conducting patrols. Professional development and leadership have been emphasized through a senior leadership seminar. This ten-course program is centered around Iraqi law, democratic policing techniques and the National Police Leadership Academy program of instruction. Over 160 sergeants and junior officers graduated courses at the Academy this quarter. Diversity of the National Police continues to improve with over 1,100 non-Shia graduating from the basic course.

Ministerial Capacity: The MoI continues to move forward in developing plans and policies that will support mission success in the future. The Minister signed and published a Strategic Vision document for the ministry. Deputy Ministers have been directed to prepare 5-year plans. These plans will assist MoI in instituting a professional development system that trains and mentors current and future generations of Iraqi leaders to support and promote moral character and integrity in service to the Iraqi people. The Ministry recently updated its police recruiting and hiring directive to ensure that current hiring practices and policies are conducted fairly. The finance office is developing and working with the International Monetary Fund’s application of the Financial Management Information System (FMIS). Direct vertical and lateral communication among the Minister and Deputies has improved. Cooperation with other ministries is improving, particularly with the Ministry of Construction and Housing and the Ministry of Finance.

Ministry of Defense Forces Overview

Ministry of Defense (MoD) forces currently include over 116,100 personnel serving in the Iraqi Army (IA), Iraqi Special Operations Forces (ISOF), Strategic Infrastructure Battalions (SIBs), Navy, Marines and Air Force. One hundred-six Iraqi Army and Special Operations battalions are now conducting counter-insurgency operations with 81 battalions assessed as capable of operating "in the lead" or independently. Sixty-nine MoD battalions control their own areas of responsibility. Combat support and combat service support (CS/CSS) units continue to be generated to provide critical combat enablers; there are eight CS/CSS and three training units currently operational and supporting Iraqi combat troops with another five expected to be operational within the next four months. SIBs remain focused on securing critical oil and electricity infrastructure. They continue to be supplied and trained according to a phased plan. There are currently eight operational SIBs.

Logistics Support: This quarter has witnessed significant moves in transitioning capability to the Iraqi Armed Forces (IAF). During May the Iraqi Ministry of Defense (MoD) issued life support contracts for over 40 locations. The Coalition is providing assistance in managing their implementation.

During June, five regional support units (RSUs) had their supply and maintenance sustainability significantly improved by the arrival of trained IAF supply and maintenancepersonnel, who, with Coalition training team support, will commence the process of transitioning the RSUs to IAF control. This process commenced at An Numaniyah in early June, the success of this RSU, will form a test-case for transition of the remaining four RSUs. A total of four Motor Transport Regiments (MTRs) have transitioned to Corps control and have commenced operational missions and supply sustainability exercises. The remainingfive MTRs are undergoing force generation and are expected to be operational by second half of 2006. In July, the national maintenance contractor will commence operations from the Taji National Depot (TND) class IX warehouse. This USG-funded contract will provide the IAF an elemental 4th line transportation capability.

Training: The Iraqi Armed Forces training system is made up of nearly thirty schools designed to train basic recruits, teach specialty skills and provide professional development and leadership skills. The basic training system remains under the command of the Iraqi Training Brigade and includes three Iraqi Training Battalions. New recruits attend a five-week program of instruction at either Kirkush or Numaniyah Military Training Base. Upon graduation, recruits receive an additional three to seven weeks of specialized training depending upon their military occupational skill assignment. This specialized training develops infantry, supply, armor, communications, administration, transportation, maintenance and military police skills, among others. Training initiatives such as the Military Intelligence School, Signal School, Iraqi Army Service and Support Institute (IASSI) and Engineer School have been implemented and continue to graduate personnel. A total of 1921 personnel have been trained in these critical skills.

A system of Regional Training Centers (RTCs) and the Non-Commissioned Officer Academy focus on junior leader development. The newly piloted Sergeants Major Course and Chief Warrant Officer Course have been added to the NCO Professional Education System. Three Iraqi Military Academies at Zakho, Qualachulon and ar-Rustimiyah are conducting officer training. The one-month Former Officer Course (FOC) continues to emphasize human rights, ethics and COIN operations. 1,032 personnel are anticipated to complete the FOC program this reporting period with another 420 in the next reporting period. Progress continues on the development of an Iraqi Armed Forces Center for Ethics and Leadership.

Air Force: The Iraqi Air Force (IqAF) has approximately 600 trained and equipped personnel staffing six squadrons: two helicopter battlefield mobility squadrons, two air surveillance squadrons, one helicopter refresher training squadron and one air transport. Since the last report, the 23rd Transport Squadron’s three C-130E aircraft completed their isochronal (major inspection on the aircraft-expensive and intensive) inspections at Abu Dhabi and are moving troops and equipment regularly. The 16 Hueys are currently being upgraded to Huey II’s on the ARINC contract in Ozark, Alabama and should be back in country by January 2007. Six CH-2000s are fully operational and flying daily missions from Kirkuk Air Base. The Iraqis are beginning to train on the Mi-17 helicopter. In addition, the Iraqi Air Force identified its top 5 proposed candidate suppliers for Intelligence, Surveillance and Reconnaissance (ISR) aircraft, and is expected to make a choice of the ISR platform this quarter.

Navy and Marine Operations: Iraqi Navy and Marines (IqN/M), in conjunction with Coalition maritime forces, conduct offshore oil platform security, anti-smuggler, anti-terrorist and anti-piracy operations in the Northern Arabian Gulf (NAG). IqN/M manpower is approximately 800 personnel with expected growth to 1,100 by the end of Fiscal Year 2006. Two boat squadrons are currently operational; however maintaining these squadrons’ mission capable status remains problematic. Engineering obstacles continue to delay delivery of three new patrol boats now under construction and governmental acquisition procedures delay the contracting of two offshore support vessels. The Italian government plans to contribute six assault boats, and the Iraqi Navy seeks to contract the construction of four patrol ships by an Italian company. Poor infrastructure development at the IqN base continues to be a problem. Without improvements to ship maintenance, acquisition and infrastructure development, Coalition naval forces will be required to guard the Iraqi oil terminals in the NAG for the foreseeable future.

LAW ENFORCEMENT

Police Training and Technical Assistance
Project Code: 10000

$ millions

FY 2006 by Quarter

2207 Report

FY 04

FY 05

Q1

Q2

Q3

Q4

Total

Obligated

Outlayed

April 2006

1,040

768

-

-2

-

-

1,806

1,774

1,529

Change from April

-

-

-

-

-

-

+ 9

+66

July 2006

1,040

768

-

-2

-

-

1,806

1,783

1,595


NOTE: Obligation and Outlay Data is current as of June 28, 2006.

Responsible U.S. Government Agency: Department of Defense, Department of State, with some funds transferred to Department of Justice

Changes from the April Report: This report maintains the $1,806 million allocated to Police Training and Technical Assistance.

Accomplishments since the April Report:

 • Purchased additional AK-47 assault rifles and Glock pistols for the Iraqi Police Forces ($1.7 million)

 • Completed construction on remaining five police stations in the Mosul and Tal Afar area ($11.9 million).

 • Construction of National Police Regiment Facilities at Taji is 97% complete ($44.7 million).

 • Construction of an Emergency Response Unit Dignitary Protection Training Site in Baghdad is 92% complete ($14.0 million).

 • Completed renovation of a forensic lab in Baghdad ($1.88 million).

 • Completed construction of a Facilities Protective Service Headquarters and Academy in Baghdad ($6.1 million)

Accomplishments anticipated next quarter:

 • Complete construction of the National Police Regiment Facilities in Taji ($44.7 million).

 • Complete construction of the Emergency Response Unit Dignitary Protection Training Site in Baghdad ($14.0 million).

 • Complete construction of the Safwan Iraqi Highway Patrol Station in Safwan ($2.5 million).

 • Complete construction of two Iraqi Police Stations in Babil ($879,000).

 • Complete construction of Commando Sites 4 and 6 in Baghdad ($23.0 million).

 • Complete construction of the Baghdad Police College to increase the cadet training capacity ($42.0 million).

 • These activities will close this project code.

Border Enforcement
Project Code: 11000

$ millions

FY 2006 by Quarter

2207 Report

FY 04

FY 05

Q1

Q2

Q3

Q4

Total

Obligated

Outlayed

April 2006

260

177

-

-

-

-

437

421

364

Change from April

-

-

-

-

-

-

-

+10

+29

July 2006

260

177

-

-

-

-

437

431

393


NOTE: Obligation and Outlay Data is current as of June 28, 2006.

Responsible U.S. Government Agency: Department of Defense and PCO

Changes from the April Report: This report maintains the $437 million allocated to border enforcement. This project code equipped and trained the Border Police and Port of Entries custodians. 76 percent of the Border Police are trained and equipped. Border Police and Port of Entry training will be completed by July. Five percent of Border Forces were equipped by the end of June and 100 % will be by the end of December. Construction is complete on 249 of 258 border forts. The remaining forts will be completed by the end of July.

Accomplishments since the April Report:

DoD

 • Completed construction at the Bashmakh Land Port of Entry ($2.0 million).

 • Completed construction at the Umm Qasr Coast Guard Forward Operating Base (FOB) ($3.5 million).

 • Completed construction at the Department of Border Enforcement Facility in Al Kut ($14.5 million).

 • Completed construction at the Akashat and Trafawi Sector Forts ($9.7 million).

PCO

 • Completed the PCO/GRD border forts program consisting of 114 forts (~$60.1 million).

Accomplishments anticipated next quarter:

DoD

 • Complete construction at the Rabea Class A Land Port of Entry and Force protection ($1.3 million).

PCO

 • Complete all close out activities and provide the Ministry of Interior all pertinent documents for the 114 PCO/GRD border forts.

The USG Border Fort program has provided Iraq 114 functional border forts, with 258 border forts being built nation wide. These facilities provide Iraq a first line of defense against illegal entry and smuggling, increasing stability and security within the country. The program created jobs and provided training for local labors in the surrounding communities on various types of construction techniques. The forts have added enhanced security for these communities and throughout Iraq, already supporting the goal of a free and independent Iraq.

Facilities Protection Service (FPS)
Project Code: 12000

$ millions

FY 2006 by Quarter

2207 Report

FY 04

FY 05

Q1

Q2

Q3

Q4

Total

Obligated

Outlayed

April 2006

53

0

-

-

-

-

53

53

33

Change from April

-

-

-

-

-

-

-

-2

+6

July 2006

53

0

-

-

-

-

53

51

39


NOTE: Obligation and Outlay Data is current as of June 28, 2006.

Responsible U.S. Government Agency: Department of Defense

Changes from the April Report: This report maintains the $53 million allocated to Facilities Protection Service (FPS). This project code equipped, armed and provided uniforms, computers and radios to the new MoI Facilities Protection Services (FPS) National Headquarters. Uniforms and equipment were also issued to the Diplomatic Protection Services (DPS). Funds were also used to develop and initiate tier-II PSD training at the Baghdad Police College. This training was conducted for the Facilities Protection Service (FPS).

Accomplishments since the April report:

 • Contracts closed out and residual funds moved to support mission requirements.

Accomplishments anticipated next quarter: Project Closed

NATIONAL SECURITY- IRAQI ARMED FORCES

Iraqi Armed Forces Facilities
Project Code: 20000

$ millions

FY 2006 by Quarter

2207 Report

FY 04

FY 05

Q1

Q2

Q3

Q4

Total

Obligated

Outlayed

April 2006

602

129

-

-

-

-

731

725

712

Change from April

-

-

-

-

-

-

-

+2

-4

July 2006

602

129

-

-

-

-

731

727

708


NOTE: Obligation and Outlay Data is current as of June 28, 2006.

Responsible U.S. Government Agency: Department of Defense

Changes from the April Report: This report maintains the $731 million allocated to Iraqi Armed Forces Facilities. This project code provides basic base infrastructure requirements such as barracks, dining facilities, admin facilities, HQ, training rooms, vehicle maintenance facilities and base support facilities to the Iraqi Armed Forces.

Accomplishments since the April Report

 • Completed construction of facilities for 2,500 soldiers of the 3rd Brigade of the 6th Division at Qasr Tel Michel ($3.2 million).

 • Completed construction of facilities for 1,750 soldiers of the 2nd Brigade of the 4th Division and their headquarters at the Kirkuk Military Base ($14.3 million).

 • Completed construction of facilities for 1,750 soldiers of the 1st Brigade of the 3rd Division and their headquarters at the Al Kasich Military Base ($13.3 million).

Accomplishments anticipated next quarter:

 • Complete construction of facilities for 250 soldiers of the 9th Division Headquarters in Taji ($2.3 million).

 • Complete construction of facilities for 250 soldiers of the 8th Division Headquarters in Diwaniyah ($1.6 million).

 • Complete construction of facilities supporting a Transportation Battalion in Numiniyah ($5.0 million).

 • Complete renovation of utilities in Habbaniyah ($5.0 million).

Iraqi Armed Forces Equipment
Project Code: 21000

$ millions

FY 2006 by Quarter

2207 Report

FY 04

FY 05

Q1

Q2

Q3

Q4

Total

Obligated

Outlayed

April 2006

606

23

-

-14

-

-

615

605

567

Change from April

-

-

-

-

-

-

+12

July 2006

606

23

-

-14

-

-

615

605

579


NOTE: Obligation and Outlay Data is current as of June 28, 2006.

Responsible U.S. Government Agency: Department of Defense

Changes from the April Report: This report maintains the $615 million allocated to the Iraqi Armed Forces Equipment Project. This project code equipped, armed and provided vehicles, uniforms, computers and radios to the Iraqi Armed Forces. Some of the major investments were: $292 million for vehicles, $28 million for weapons, $33million for communications equipment, $89M for other equipment and $49M for maintenance.

Accomplishments since the April Report:

Contract closeout completed and remaining funds identified will be moved to support mission requirements.

Accomplishments anticipated next quarter: Project code closed.

Iraqi Armed Forces Training and Operations
Project Code: 22000

$ millions

FY 2006 by Quarter

2207 Report

FY 04

FY 05

Q1

Q2

Q3

Q4

Total

Obligated

Outlayed

April 2006

394

35

-

2

-

-

431

407

376

Change from April

-

-

-

-

-

-

+10

+18

July 2006

394

35

-

2

-

-

431

417

394


NOTE: Obligation and Outlay Data is current as of June 28, 2006.

Responsible U.S. Government Agency: Department of Defense

Changes from the April Report: This report maintains the $431 million allocated to the Iraqi Armed Forces Training and Operations Project. This project code trained and improved the operational capabilities of the Iraqi Armed Forces. Some of the major investments include: operations and training costs of the Basic Branch Schools ($231 million) and equipment, furniture, vehicles and weapons for the schools ($90 million).

Accomplishments since the April Report:
Contract closeout completed and remaining funds identified will be moved to support mission requirements.

Accomplishments anticipated next quarter: Project code closed.

Iraqi National Guard Operations and Personnel
Project Code: 23000

$ millions

FY 2006 by Quarter

2207 Report

FY 04

FY 05

Q1

Q2

Q3

Q4

Total

Obligated

Outlayed

April 2006

159

66

-

-

-

225

214

183

Change from April

-

-

-

-

-

-

+1

+11

July 2006

159

66

-

-

-

225

215

194


NOTE: Obligation and Outlay Data is current as of June 28, 2006.

Responsible U.S. Government Agency: Department of Defense

Changes from the April Report: This report maintains the $225 million allocated to Iraqi National Guard Operation and Personnel. The initial funds provided $145.5 million for the Operations and Maintenance of Multi-National Command-Iraq, while supporting Iraqi Security Forces. Some of the expenditures were sanitation services for 1/1 IA on East Ramadi Camps, MNF-W, 3/1/7 IA and 7th Div HQ on Blue Diamond, MNF-W and 1/3/4 IA on FOB McKenzie, MND-N. Life support services for two IA companies on FOB Butler Range, MND-N. T-walls, jersey barriers and guard towers for 3/5 IA in the MNF-W area. The balance funded $79.1 million for the operations of the Iraqi National Guard, now known as the Iraqi Armed Forces. Expenditures included requirements for Life Support (39.6 million), Aviation training ($1.7 million), EOD training ($1.8 million), mobilization cost ($6.9 million) and funding to the Multi-National Command-Iraq for their Transition Team Integration Fund ($7.3 million) and Emergency Life Support for the Iraqi Security Forces ($6.7 million).

Accomplishments since the April Report:

Contract closeout completed and remaining funds identified will be moved to support mission requirements.

Accomplishments anticipated next quarter: Project code closed.

Iraqi National Guard Equipment
Project Code: 24000

$ millions

FY 2006 by Quarter

2207 Report

FY 04

FY 05

Q1

Q2

Q3

Q4

Total

Obligated

Outlayed

April 2006

81

11

-

-

-

-

92

89

86

Change from April

-

-

-

-

-

-

-

-

+2

July 2006

81

11

-

-

-

-

92

89

88


NOTE: Obligation and Outlay Data is current as of June 28, 2006.

Responsible U.S. Government Agency: Department of Defense

Changes from the April Report: This report maintains the $92 million allocated to Iraqi National Guard Equipment. The funds in this project code provided funds for equipment, furniture, vehicles and weapons for the Iraqi Armed Forces.

Accomplishments since the April Report:

Contracts closed out and residual funding moved to support mission critical priorities.

Accomplishments anticipated next quarter: Project code closed

Iraqi National Guard Facilities
Project Code: 27000

$ millions

FY 2006 by Quarter

2207 Report

FY 04

FY 05

Q1

Q2

Q3

Q4

Total

Obligated

Outlayed

April 2006

-

359

-

7

-

-

366

353

329

Change from April

-

-

-

-

-5

-5

+2

+12

July 2006

-

359

-

7

-

-5

361

355

341


NOTE: Obligation and Outlay Data is current as of June 28, 2006.

Responsible U.S. Government Agency: Department of Defense

Changes from the April Report: This report reflects a previous notification to Congress of the Administration’s intent to decrease this project code by $5.4 million. Funds were reallocated to support the completion of the Primary Healthcare Clinics within Nationwide Hospital and Clinic Improvements (PC 9000).

Accomplishments since the April Report:

 • Completed construction of facilities for the 1st Brigade of the 1st Division and their headquarters at Al Rasheed Military Base ($45.5 million).

 • Completed construction on the consolidated generator project at Kirkuk, supporting 3,500 soldiers ($7.9 million).

 • Completed construction on the generators and fencing project at Tallil, supporting 1,000 soldiers ($5.0 million).

 • Completed construction at the Umm Qasr Dock at the Umm Qasr Naval Base supporting 500 sailors ($5.0 million).

Accomplishments anticipated next quarter:

 • Complete construction of facilities for 750 soldiers of the 4th Battalion, 1st Brigade, 2nd Division at FOB 7 outside Samara ($11.1 million).

 • Complete construction of facilities for 250 soldiers of the 4th Brigade, 10th Division Headquarters at FOB Sparrow in Al Amarah ($6.6 million).

 • Complete construction of facilities for 1,500 soldiers of the 2nd and 3rd Battalions of the 2nd Brigade, 1st Division in Habbaniyah ($6.2 million).

 • Complete construction of facilities for 750 soldiers of the 3rd Battalion of the 2nd Brigade, 2nd Division in Hammal Al Alil ($9.2 million).

 • Complete construction of the Az Zubar Explosive Ordnance School ($3.1 million).

Iraqi Security Forces Quick Response Program
Project Code: 26000

$ millions

FY 2006 by Quarter

2207 Report

FY 04

FY 05

Q1

Q2

Q3

Q4

Total

Obligated

Outlayed

April 2006

40

130

-

-7

-

-

163

157

149

Change from April

-

-

-

-

-

-

-

+1

+3

July 2006

40

130

-

-7

-

-

163

158

152


NOTE: Obligation and Outlay Data is current as of June 28, 2006.

Responsible U.S. Government Agency: Department of Defense

Changes from the April Report: This report maintains the $163 million allocated to Iraqi Security Forces Quick Response Program.

Accomplishments since the April Report:
 • Funded $963,000 project to renovate and improve security at National Police Academy in Baghdad.
 • Funded fuel cleaning and storage point to ensure fuel is a better quality and on-hand as needed in Um Qasr ($910,000).
 • Funded $977,000 for Kevlar helmets to replenish dwindling supplies for the Iraqi Army.
 • Authorized $871,000 for Iraqi Police vehicles to be used for daily missions throughout Fallujah.

Accomplishments anticipated next quarter: Project closed.

Nonproliferation and Export Control and Border Security
Project Code: 09600

$ millions

FY 2006 by Quarter

2207 Report

FY 04

FY 05

Q1

Q2

Q3

Q4

Total

Obligated

Outlayed

April 2006

-

-

-

3

-

-

3

-

-

Change from April

-

-

-

-

-

-

-

+1

+1

July 2006

-

-

-

3

-

-

3

1

1


NOTE: Obligation and Outlay Data is current as of June 28, 2006.

Responsible U.S. Government Agency: Department of State, Bureau of International Security and Nonproliferation (ISN)

Changes from the April Report: This report maintains the $3 million to continue the current Iraqi WMD Expertise Redirect Program and provide radiation detection equipment and training for the Iraqi border guards.

The Iraqi WMD Expertise Redirect Program plays a crucial role in inhibiting proliferation of Iraq’s weapons expertise through payment of regular stipends to approximately 150 key Iraqi weapons development personnel, provision of career transition assistance in the form of workshops, seminars and collaboration with western counterparts and the funding of science-based projects proposed by program participants and focusing on areas of importance to the reconstruction of Iraq.

Accomplishments since the April Report:

 • Identified and initiated work on three science-based projects proposed by former weapons scientists currently participating in the Iraqi Interim Center for Science and Industry (the redirection program office in Baghdad). Projects concern an ozone water treatment pilot plant, water-quality monitoring and non-destructive lab refurbishment ($475,000).

 • Continued operation of the Iraqi International center for Science and Industry (IICSI): $250,000

     Scientist stipends: 120,000
     Scientist travel support: 75,000
     Staff salaries: 36,000
     Operating expenses 19,000

 • Supported Iraqi weapons scientists’ participation in the Rebuild Iraq - 2006 exposition in Amman, Jordan, in May 2006.

Accomplishments anticipated next quarter:

 • Continue operation of IICSI: $280,000

     Scientist stipends: 130,000
     Scientist travel support: 90,000
     Staff salaries: 40,000
     Operating expenses 20,000

 • Continue efforts to identify and support science-based projects proposed by participating scientists: $250,000.

Focused Stabilization

Project Code: 08500

$ millions

FY 2006 by Quarter

2207 Report

FY 04

FY 05

Q1

Q2

Q3

Q4

Total

Obligated

Outlayed

April 2006

-

-

-

30

-

-

30

-

-

Change from April

-

-

-

-

-

-

-

+30

-

July 2006

-

-

-

30

-

-

30

30

-


NOTE: Obligation and Outlay Data is current as of June 28, 2006.

Responsible U.S. Government Agency: USAID

Changes from the April Report: This project code maintains the $30 million allocated to this project code. The objective of the program is to support economic stabilization efforts by supporting employment, skills training and business development programs.

Accomplishments since the April Report:

 • Agreement negotiated and awarded to Implementing Partner.

 • Implementing Partner offices established and recruiting of staff for program activities initiated.

 • Draft work plan prepared.

Accomplishments anticipated next quarter:

 • Submit, review and approve work plan.

 • Implementing partner to complete mobilization.

 • Initiate activities for the three components: Employment, Skills Training and Business Development.

 • Initiate coordination activities with relevant stakeholders including the appropriate Provincial Reconstruction Teams (PRTs), U.S. Embassy in Iraq and U.S. Military as to the geographic focus of the program, program accomplishments, progress metrics and coordination effort.

Commander’s Humanitarian Relief & Reconstruction
Project Code: 28000

$ millions

FY 2006 by Quarter

2207 Report

FY 04

FY 05

Q1

Q2

Q3

Q4

Total

Obligated

Outlayed

April 2006

-

86

-

-

-

-

86

85

64

Change from April

-

-

-

-

-

-

-

+1

+3

July 2006

-

86

-

-

-

-

86

86

67


NOTE: Obligation and Outlay Data is current as of June 29, 2006.

Responsible U.S. Government Agency: Department of Defense/Multinational Force-Iraq (MNF-I) and USAID

Changes from the April Report: This report maintains the $86 million allocated for the Commander’s Humanitarian Relief and Reconstruction Projects (CHRRP).

Accomplishments since the April Report:

DoD

 • Continued construction on the Qubaidy sewer system renovation, which is 65% complete. New estimated completion date is July (~$15 million).

 • Continued construction on the Kamalay sewer system renovation. Work is back on schedule after numerous security issues. Currently 89% with a new completion date of August (~$25.4 million).

 • Continued construction on the Assyria sewer system project. After review of construction, this project is up for re-bid of contractor due to substandard material used. Project currently at 40% completion due to re-work of bad section (~$1.8 million).

 • Started construction work on the Kharkh sewer system security improvements. This project will update the security at the Kharkh sewer plant thus increasing work production with an estimated completion date of September ($900,000).

 • Continued construction on Kirkuk pressure Zone 5 distribution, one kilometer, 100 meter pipe with 2X valves. Work on schedule with an estimated completion date of August. Currently 75% complete (~$1 million).

 • Continued progress on Al Abayachi Water Project. Work is back on schedule after numerous security issues; project is 50% complete with estimated completion date of September ($331,046).

 • Continued progress on Al Alath Water Project in Isahki, Salah al-Din. Late start due to contracting problems; currently 45% complete ($505,000).

 • Continued progress on Balad Train Station water project, with an estimated completion date of September. 70% complete ($620,000).

 • Continued construction of Altun Kapri water tower, with an estimated completion date of August; 65% complete ($92,000).

 • Continued construction of Kalwar water tower. Work is back on schedule after 150-day performance review with a new estimated completion date of September; 50% complete ($92,000).

 • Continued progress on Taraka village water project. Delayed due to continuing contracting issues. 40% complete. No new estimated completion date given ($58,000).

USAID

To date IRD assisted more than 750 small businesses through CAP Economic and Business Development Program, creating over 2,500 long term jobs. Manufacturing, agriculture, construction and service businesses form 76% of the total value of grants that have been approved and completed to date. Agricultural projects (e.g. cattle and sheep breeding, hen egg farms and dairy factories) also make up a considerable percentage of total projects. These types of businesses are rated the highest among all other businesses in terms of job creation. IRD/CAP focused on projects that created long- term jobs and opportunities for sustainable income generation. These projects are an important component in the creation of long-term stability and the economic development of local communities.

Anticipated accomplishments next quarter:

USAID

Project Code closed out

DoD

 • Complete Qubaidy sewer system renovation (~$15 million).

 • Complete Kamalay sewer system renovation (~$25.4 million).

 • Complete Kirkuk pressure Zone 5 distribution, one kilometer, 100 meter pipe with 2X valves (~$1 million).

 • Complete Al Alath Water Project in Isahki, Salah al-Din ($505,000).

 • Complete Altun Kapri water tower ($92,000).

 • Complete Kalwar water tower ($92,000).

 • Complete Al Abayachi Water Project ($331,000).

 • Complete Balad Train Station water project ($620,000).

 

SECTOR: Justice, Public Safety Infrastructure and Civil Society

Other Technical Investigative Methods
Project Code: 31000

$ millions

FY 2006 by Quarter

2207 Report

FY 04

FY 05

Q1

Q2

Q3

Q4

Total

Obligated

Outlayed

April 2006

5

-

-

-

-

-

5

1

1

Change from April

-

-

-

-

-

- 3

- 3

-

-

July 2006

5

-

-

-

-

-3

2

1

1


NOTE: Obligation and Outlay Data is current as of June 28, 2006.

Responsible U.S. Government Agency: Departments of Defense and State, with some funds transferred to the Department of Justice.

Changes from the April Report: This report reflects a previous notification to Congress of the Administration’s intent to decrease this project code by $2.8 million, reallocating funds to Nationwide Hospitals and Clinics (PC 90000) to support the completion of the Primary Healthcare Clinics.

Accomplishments since the April Report:

Due to delays in construction of the new headquarters building for the Commission on Public Integrity, which will now be completed early in 2007, additional purchases planned for this project code have been cancelled and funding reallocated to the PHC program within the Health Sector. This project code is closed.

Anticipated accomplishments next quarter: Project closed.

Witness Protection Program
Project Code: 30000

$ millions

FY 2006 by Quarter

2207 Report

FY 04

FY 05

Q1

Q2

Q3

Q4

Total

Obligated

Outlayed

April 2006

40

-3

-

-

-

-

37

35

10

Change from April

-

-

-

-

-

-1

- 1

+1

-

July 2006

40

-3

-

-

-

-1

36

36

10


NOTE: Obligation and Outlay Data is current as of June 28, 2006.

Responsible U.S. Government Agency: Departments of Defense/Project and Contracting Office (PCO) and State, with funds transferred to the Department of Justice

Changes from the April Report: This report reflects a previous notification to Congress of the Administration’s intent to decrease this project code by $1 million, reallocating funds to Nationwide Hospital and Clinic Improvements in support of the completion of the Primary Healthcare Clinics. It maintains the $35 million allocated to support a Witness Protection Program and the Commission on Public Integrity (CPI).

Accomplishments since the April Report:

DoD

 • The Army Corps of Engineers started construction on the witness security facilities in Mosul and Basrah ($5.0 million) as part of a U.S. Marshals Service project funded through the State Department.

 • The Army Corps of Engineers continued construction of the witness security facility in Baghdad’s Al Karkh District ($2.5 million), also part of a U.S. Marshals Service project funded through the State Department. Contract modifications have extended the project schedule.

 • Continued incremental purchases of weapons, ammunition and assorted gear to support 500 new security personnel for force protection of the CPI investigating agents (~$1 million).

Department of Justice (DoJ)

 • Purchased 3 armored personnel carriers, plus 10 armored cars/SUVs for movement of witnesses and judges.

 • Purchased anti-IED devices and tracking equipment for new vehicles ($3.2 million).

 • Started construction/renovation of two witness security sites. Purchase security equipment for new facilities. Hire, train and equip guard forces for new facilities ($5.7 million).

CPI

As CPI has been self financing for the last two quarters, the excess funds will be reallocated to supporting the completion of the 121 PHCs within the Health Sector. This closes out CPI activities in this project code.

Anticipated accomplishments next quarter:

DoD

 • Start construction on the witness security facilities in Baghdad’s Rusafa District ($2.5 million.

 • Complete construction of the witness security facility in Baghdad’s Al Karkh District ($2.5 million).

Penal Facilities
Project Code: 32000

$ millions

FY 2006 by Quarter

2207 Report

FY 04

FY 05

Q1

Q2

Q3

Q4

Total

Obligated

Outlayed

April 2006

100

-13

-

-

-

-

87

86

35

Change from April

-

-

-

-

-

-

-

-1

+8

July 2006

100

-13

-

-

-

-

87

85

43


NOTE: Obligation and Outlay Data is current as of June 28, 2006.

Responsible U.S. Government Agency: Department of Defense/PCO

Changes from the April Report: This report maintains the $87 million allocated for penal facilities, specifically for the Maximum Security Correctional Facility in Nassriya.

Accomplishments since the April Report:

 • Continued construction of 800-bed Nassriya correctional facility. The facility is now estimated to be completed by June/July 2007. Contractor performance is currently under review due to schedule delays and increasing costs.

Accomplishments anticipated next quarter:

 • Continue construction of 800-bed Nassriya correctional facility with an award of bridge contract. Work towards soliciting completion contract in late July. Target prison completion date is estimated at June /July 2007.

Reconstruction and Modernization of Detention Facilities
Project Code: 33000

$ millions

FY 2006 by Quarter

2207 Report

FY 04

FY 05

Q1

Q2

Q3

Q4

Total

Obligated

Outlayed

April 2006

135

30

-

2

39

-

206

151

72

Change from April

-

-

-

-

-

-

-

+16

+9

July 2006

135

30

-

2

39

-

206

167

81


NOTE: Obligation and Outlay Data is current as of June 28, 2006.

Responsible U.S. Government Agency: Departments of Defense/PCO, Justice-International Criminal Investigative Training Assistance Program (ICITAP) and State

Changes from the April Report: This report maintains the $206 million allocated to Reconstruction and Modernization of Detention Facilities.

Accomplishments since the April Report:

PCO 

 • Terminated the design build contract for construction of 1,800 bed multi-custody correctional facility in Khan Bani Sa’ad; currently 41% complete (~$72.9 million). Contract was terminated as a result of poor performance and lack of schedule adherence. Construction continues via a fixed-price bridge contract re-awarded to the onsite Iraqi firm. A contract will be re-awarded to complete the remaining work.

 • Continued construction-renovation of Zrka Rehabilitation Center in Dahuk; currently 40% complete (~$5.6 million).

Department of Justice (ICITAP)

 • Received vehicles and security equipment, including weapons, body armor, helmets with shields and ammunition, to be distributed to Iraq Correctional Services (ICS) (~$500,000).

 • Awarded contract to purchase buses and pick-up trucks for the ICS Security Force to provide increased protection while transporting offenders (~$1 million).

 • Installed 21 each MTR 2000 Repeaters at ICS facilities throughout Iraq to facilitate radio communications within ICS.

Accomplishments anticipated next quarter:

PCO

 • Award contract to complete the Khan Bani Sa’ad correctional facility and continue construction. Construction of the facility is expected to be completed by end of September 2008.

 • Continue work at Zrka Rehabilitation Center in Dahuk.

Department of Justice (ICITAP)

 • Analyze equipment needs for new prisons and procure as funds become available.

FACILITIES REPAIR, FIRE SERVICE AND DEMINING

Facilities Repair
Project Code: 13000

$ millions

FY 2006 by Quarter

2207 Report

FY 04

FY 05

Q1

Q2

Q3

Q4

Total

Obligated

Outlayed

April 2006

92

-3

-

-

-

-

89

84

64

Change from April

-

-

-

-

-

-

-

-1

+5

July 2006

92

-3

-

-

-

-

89

83

69


NOTE: Obligation and Outlay Data is current as of June 28, 2006.

Responsible U.S. Government Agency: Department of Defense/PCO

Changes from the April Report: This report maintains the $89 million allocated to Facilities Repair.

Accomplishments since the April Report:

 • Completed construction of 9 new fire stations ($9.9 million).

 • Completed renovations of 3 fire stations ($605,000).

Accomplishments anticipated next quarter:

 • Complete construction of the 2 remaining new fire stations ($2.2 million)

Fire Service
Project Code: 14000

$ millions

FY 2006 by Quarter

2207 Report

FY 04

FY 05

Q1

Q2

Q3

Q4

Total

Obligated

Outlayed

April 2006

122

-7

-

-

-

-

115

108

103

Change from April

-

-

-

-

-

-

-

-6

-4

July 2006

122

-7

-

-

-

-

115

102

99


NOTE: Obligation and Outlay Data is current as of June 28, 2006.

Responsible U.S. Government Agency: Department of Defense/PCO

Changes from the April Report: This report maintains the $115 million allocated for Fire Service.

Accomplishments since the April Report:

 • Solicited contract to purchase materials to modify power supply for the compressor to fill the Self Contained Breathing Apparatus (SCBA) ($45,000).

 • Solicited contract for purchase of Hazardous Material (HAZMAT) handling and identification equipment. This gives Iraq Fire Departments the capacity to respond to Nuclear, Biological and Chemical Incidents (~$758,000).

 • Solicited contract for training of HAZMAT team. This will increase capacity and certify HAZMAT technicians in select nuclear, biological and chemical skills (~$500,000).

 • Solicited contract for Officer Training outside Iraq for the Iraqi Civilian Defense Directory to build personnel capacity and increase professional skills. (~$3.9 million).

 • Solicited contract to build a security fence for two fire stations in Baghdad to increase the security of the Fire Stations (~$114,000).

 • Solicited contract for purchase of firefighting foam additive. This is required for the Iraqi Civilian Defense Directory to fight chemical and fuel fires (~$1 million).

 • Solicited contract for the purchase of four trailer mounted air compressors for the Iraqi Civilian Defense Directory. (~$300,000).

 • Solicited contract for Rescue Training and Equipment for the Iraqi Civilian Defense Directorate to build capacity and have ability to respond to disasters (~$1.3 million).

 • Solicited contract for maintenance training to provide capacity for Iraq Fire Officials to maintain capital equipment purchased through IRFF and procured through the U.N. Oil for Food program that operated prior to Operation Iraqi Freedom ($550,000).

 • Delivered four minipumper fire trucks, four medium rescue trucks, twenty utility trucks and six fuel tankers to Northern Iraq Provinces Civil Defense Directorate.

 • Delivered forty minipumper fire trucks, 21 medium rescue trucks and eight fuel tankers to Southern Iraq Provinces Civil Defense Directorate.

 • Delivered 43 minipumper fire trucks, two medium rescue trucks, twelve fuel tankers and five Blazers to Baghdad Civil Defense Directorate.

 • Delivered one thirty foot fireboat and four nineteen foot fireboats to Iraq Civil Defense Directorate.

Accomplishments Anticipated next quarter:

 • Solicit contract for HAZMAT Trucks for the Iraqi Civilian Defense Directorate (~$600,000).

 • Solicit contract for portable communications equipment for the Iraqi Civilian Defense Directorate. (~$300,000).

 • Solicit contract for executive training for the Iraqi Civilian Defense Directorate. This is planned in the Gulf Region and will build capacity and increase professional ability. (~$200,000).

 • Solicit contract for EOD Training for the Iraqi Civilian Defense Directorate (~$200,000).

 • Solicit contract for portable lighting equipment for the Iraqi Civilian Defense Directorate (~$250,000).

 • Solicit contract for the modification of ventilation fans for the Iraq Civil Defense Directorate (~$10,000).

 • Solicit contract for the training of Calibration specialists to maintain Self Contained Breathing Apparatus (~$25,000).

 • Solicit contract for the purchase of a training tower to assist in building capacity at the Iraq Civil Defense Directorate (~$250,000).

 • Solicit contract for the purchase of portable training trailers for the Iraq Civil Defense Directorate. (~$600,000).

 • Conduct Fire Officer training and capacity building for 400 Firefighters.

 • Complete construction of two security fences at Iraq Fire Stations.

 • Complete delivery of firefighting foam to Southern Provinces (~$700,000).

 • Conduct HAZMAT awareness training for 400 firefighters.

 • Conduct Executive training in region for 25 Fire Chiefs.

Demining
Project Code: 09500

$ millions

FY 2006 by Quarter

2207 Report

FY 04

FY 05

Q1

Q2

Q3

Q4

Total

Obligated

Outlayed

April 2006

61

9

4

9

-

-

83

74

72

Change from April

-

-

-

-

-

-

+9

+2

July 2006

61

9

4

9

-

-

83

83

74


NOTE: Obligation and Outlay Data is current as of June 28, 2006.

Responsible U.S. Government Agency: Department of State

Changes from the April Report: This report maintains the $83 million allocated to fund a combination of minefield and battle area clearance (BAC) operations and explosive ordnance disposal (EOD) missions by the Iraqi Mine UXO Clearance Organization (IMCO) and the Mines Advisory Group (MAG) as well as conduct survey operations by the Vietnam Veterans of America Foundation (VVAF).

This program contributes to post-battle operations, improves the humanitarian environment for returning populations, especially children and increases prospects for donor and Iraqi budget funded economic development by clearing land for agricultural and other economic use.

RONCO, the State Department contractor, has successfully established a demining/UXO NGO for the center/south of the country. That NGO, IMCO, has cleared power lines, university campus areas, military bases and oil fields and just recently cleared, for the U.S. military, a strategic ammunition storage point in Tal Afar that had been a source of IED material. A large quantity of lethal Unexploded Ordnance (UXO) is being destroyed each day.

Accomplishments since the April Report:

 • Completed the tasking of IMCO to Tal Afar to assist the 1st Brigade, 1st Armored Division clearing part of a large ammunition storage point reducing the amount of explosive material available to insurgents.

 • Completed Phase I training of IMCO personnel utilizing mechanical demining equipment.

 • Provided Landmine/UXO awareness training to the Ministry of Interior by IMCO.

 • Continued supporting the IMCO including a long term tasking from the Ministry of Oil to clear the Rumaila oil fields.

 • Completed the training of three Iraqi Army Bomb Disposal Companies and commenced training of an additional three Bomb Disposal Companies. Continued to train IPs and IA in IED disposal. Commenced the training of Iraqi Army Bomb Disposal Instructors.

 • MAG minefield, BAC and EOD clearance along the "Green Line" in Erbil governorate has been completed.

 • Two multi services EOD units in Dahuk graduated in April. They are now trained, equipped and ready to be deployed as local authority EOD units.

 • MAG IA/ING 54 man Humanitarian Mine Action (HMA) unit competed clearance of their first minefield as part of managed on the job training (MOTJT). The unit also began EOD level 3 and Survey and Demarcation training.

 • Completed the Iraq Landmine Impact Survey (ILIS) South Final Report for the southern region.

Anticipated accomplishments next quarter:

 • Complete the tasking of IMCO to Ba'quba to clear landmines from a hazardous area in close proximity to an Iraq Army and Coalition Forces SF training and operational base. 
 
 • Complete training of IMCO personnel utilizing mechanical demining equipment. 
 
 • Complete the training of three Iraqi Army Bomb Disposal Companies. Continue to train IPs and IA in IED disposal. Continue the training of Iraqi Army Bomb Disposal Instructors and commence the training of Iraqi Army IED instructors. 
 
 • Continue population of the Information Management System for Mine Action (IMSMA) National database, to include information sharing to all national stakeholders, to assist with reconstruction planning, humanitarian and security operations. 
 
 • Facilitate national EOD/IEDD coordination meetings between Iraqi Government, Iraqi Army, Iraqi Police, Coalition Forces, International Stakeholders and mine action organizations operating throughout Iraq. 
 
 • Continue minefield clearance, BAC and EOD using Mine Action Teams (MATs) and Mechanical teams in the governorates of Erbil, Sulaymaniyah, Dahuk, Kirkuk, Diyala and Ninewa. 
 
 • Continue community liaison and Mine Risk Education (MRE) in Erbil, Sulaymaniyah, Dahuk, Kirkuk, Diyala and Ninewa. MRE programs conducted include shepherd, villager, child and visitor. 
 
 • Extend Ministry of Education MRE training program to the northern governorates of Ninewa and Kirkuk. This program incorporates MRE into the primary education curriculum, training teachers and school supervisors, providing materials and following up progress with assessments and provision of additional materials and training. 
 
 • Build institutional capacity of a local NGO partner in the areas of management, strategic planning, fundraising, financial management, technical knowledge and operational activities. With MAG’s support this local partner is providing MRE and victim surveillance in central and southern Iraq. 
 
 • Continue BAC, EOD and minefield clearance activities across north Iraq. 
 
 • Continue community liaison and MRE activities across north Iraq including the implementation of the Ministry of Education MRE training program in Ninewah and Kirkuk governorates. 
 
 • Deploy mine detection dog teams (MDDT) to facilitate minefield clearance and improve efficiency. 
 
 • Continue capacity building of IA/ING including on MOTJT with actual clearance outputs. 
 
 • Establishment of dedicated EOD and BAC teams to reduce the prevalence of UXO potentially used for anti-government and anti-MNFI activities.

 • Complete the ILIS-South final report for nine governorates.

 • Continue the UXO survey of Mosul, Tikrit and Diyala Governorates.

Public Safety Training and Facilities
Project Code: 15000

$ millions

FY 2006 by Quarter

2207 Report

FY 04

FY 05

Q1

Q2

Q3

Q4

Total

Obligated

Outlayed

April 2006

139

81

-

-

-

-

220

212

167

Change from April

-

-

-

-

-

-29

-29

-2

+5

July 2006

139

81

-

-

-

-29

191

210

172


NOTE: Obligation and Outlay Data is current as of June 28, 2006.

Responsible U.S. Government Agency: Department of Defense/PCO

Changes from the April Report: This report reflects a previous notification to Congress of the Administration’s intent to decrease this project code by $29.0 million. The decrease is a result of a decision to cancel construction of the National Fire and Civil Defense Academy due to delays in design and contract award and to reallocate funds to Nationwide Hospital and Clinic Improvements (PC 90000) to support the completion of Primary Healthcare Clinics throughout Iraq. The rehabilitation of the Civil Defense Headquarters (CDHQ) is now complete. The CDHQ facility serves as the center of operations for all fire fighting and rescue capacity in Iraq.